On a journey of discovery to historical sites? Download the TracesOfWar app directly on Google Play or the Apple App Store.

Schwerbelastungskörper Berlin

This concrete cylinder ('Schwerbelastungskörper') was built in 1941 by Dyckerhoff & Widmann AG to study the feasibility of constructing a massive triumphal arch on the site. The construction stands 18 m (59 ft) high and has a mass of 12,650 tonnes.

Do you have more information about this location? Inform us!

Source